Steel-framed glass wine room beside a limestone wall
Example project

- Home
- 2010s single-story house on a slab, the great room open to a covered patio
- Original request
- A glass wine room between the front door and the dining area, for about 700 bottles
- Space
- A corner of the great room beside the limestone wall, about 10 by 9 ft
- Design
- Black steel-framed insulated glass on two sides with a glass door, racks from floor to ceiling on three walls, a low display shelf along the back wall
- Capacity
- About 700 bottles
- Cooling
- Ducted split system, with an outdoor part rated for summer heat
- Timeline
- Five weeks of work in the house, after eight to ten weeks for the steel and glass
- Estimated cost
- $43,000
Scope of work
Framing the back wall and ceiling inside the corner, insulation and a continuous vapor barrier on the solid walls and ceiling, the slab under the room sealed, black steel-framed insulated glass on two sides with a sealed glass door, racks on three walls with a low display shelf at the back, low-heat lighting, and a ducted split system sized for the glass and August, with its own circuits, a drain and the city's mechanical permit.
Project overview
In this example, the owners of a 2010s house want their collection on show in the great room, which guests cross from the front door to the dining area by the covered patio. The corner beside the limestone wall can take a glass room about 10 by 9 ft.
Here the hard part is heat and humid air. Two walls of glass let in a lot of heat on summer afternoons, so the cooling is sized for the glass and for August, and the glass is insulated so the room side stays warm enough not to fog. The slab under the room is counted in the cooling too, and a split system sends the heat outdoors instead of into the house.
The goal
The goal is a glass room off the great room that holds about 700 bottles near 55°F through a Texas summer, with clear glass and no machine noise.
Process
- Design Room size, glass layout and racks settled, and a heat-load check that counts the glass, the slab and August afternoons.
- Ordering Steel frames and glass built to order, eight to ten weeks.
- Weeks one and two Back wall and ceiling framed, slab sealed, power and line set routed, insulation and vapor barrier in.
- Weeks three and four Finishes, racks and the low display shelf.
- Week five Glass and door set and sealed, split system started under the city's mechanical permit.
Planning right
- An outdoor part in full afternoon sun works harder. The shaded side of the house is the better spot.
- Humid air fogs a cold pane. Insulated glass with sealed edges keeps the room side clear.
- The mechanical permit for a split system is applied for by a licensed air conditioning and refrigeration contractor.
- Seal the slab before any flooring goes down inside the room.